UK Company Read more

Why more than 1000 customers made choice with us?

Products that are for sale

scroll product
Download to calculate the cost

We a happy to help you

We will be happy to consult you or provide installation. For more information use feedback form.

As we laid the track and what it looks like

scroll layingtrack

Operating instructions

5 steps required to install

Requires: cement, sand and water. Recommended proportions: 1 part cement and 3 parts sand.

  1. Align the base for concrete, cover with water, put a plastic form.
  2. Before first use, it is recommended to cover the inside of the engine oil.
  3. Prepare a mixture of concrete and cover it in the mold.
  4. Remains concrete carefully remove with a spatula or other suitable instrument.
  5. Wait about 1 hour and carefully remove the mold.
  6. Place the form in a new place.
! Together with the form you will receive detailed instructions. We remind you that we provide the same Uslu laying tracks through our form.
scroll instructions